Secretive Irish Climate Science Denier Group Steps Up 'Bizarre' Parliamentary Lobbying 22:27 Sep 27 0 comments EU Commission proposes new strict EU-wide rules on single-use plastics 12:29 May 29 0 comments Protecting WIldlife in Ireland from Hedge Cutting and Gorse Burning 23:37 Feb 23 0 comments WRECK THE « CLIMATE CHANCE » SUMMIT! At Nantes, France, from 26 to 28 September 2016 20:04 Jul 17 0 comments Why the corporate capture of COP21 means we must Kick Big Polluters Out of climate policy 22:47 Dec 03 3 comments more >>Blog Feeds
Anti-EmpireNorth Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi? Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi? Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi? ?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi? US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty
Human Rights in IrelandPromoting Human Rights in Ireland
Lockdown Skeptics
News Round-Up Sat Jan 18, 2025 01:49 | Toby Young
Massive Fire at One of World?s Largest Battery Storage Facilities Fri Jan 17, 2025 17:00 | Will Jones
Climate Change Giving Meaning to Life Fri Jan 17, 2025 15:13 | Dr James Allan
BP to Cut 8,000 Jobs as Net Zero Bites Fri Jan 17, 2025 13:30 | Will Jones
Insurers Love the ?Climate Emergency? ? Higher Premiums all Round Whatever the Actual Facts Fri Jan 17, 2025 11:32 | Chris Morrison
Voltaire NetworkVoltaire, international editionTrump and Musk, Canada, Panama and Greenland, an old story, by Thierry Meyssan Tue Jan 14, 2025 07:03 | en Voltaire, International Newsletter N?114-115 Fri Jan 10, 2025 14:04 | en End of Russian gas transit via Ukraine to the EU Fri Jan 10, 2025 13:45 | en After Iraq, Libya, Gaza, Lebanon and Syria, the Pentagon attacks Yemen, by Thier... Tue Jan 07, 2025 06:58 | en Voltaire, International Newsletter N?113 Fri Dec 20, 2024 10:42 | en |
Wind Turbine building at Rossport Solidarity Camp
mayo |
environment |
news report
Tuesday September 04, 2012 21:42 by C - RSC rossportsolidaritycamp at gmail dot com 085-1141170
From the 10th to 16th of August, Rossport Solidarity Camp hosted it's 3rd wind turbine building course. You can read a report of the first one here: http://www.indymedia.ie/article/95731. As the 3 previous turbines that were built are still going strong (and powering both the camp and camp house), this year it was decided to go for something bigger and more challenging. This year it's was decided to build a 4.2 metre turbine that is planned eventually to be connected to the grid at the house of a local Shell to Sea campaigner. The course which was originally scheduled to run from the 4th to the 10th August had to be delayed for 2 days after Shell go their TBM stuck, which as well as disrupting local traffic also disrupted the scheduling plans for the turbine course.. |
View Comments Titles Only
save preference
Comments (2 of 2)
Jump To Comment: 1 2..
Placing the magnet on the rotor disks
Adding the resin to make up the 2 rotor disks
Cleaning up the stator (which is made up of copper coils in resin)
..
The turbine frame on the tower head
Some finishing touches
Work also continued on a smaller turbine
Assembling the turbine for testing
Getting the blades balanced